• Wagin Gold Project

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 0

    Wagin Gold project (E 70/6135), in an under explored region of Western Australia. Four mine shafts from the early 1900’s reportedly produced 177.3 g of Gold from 10.2 t of ore. Airborne Magnetics show the Wagin Gold Project on an interpreted fault line that runs out of Newmonts 30moz Au Read more [...]

  • Mt. Flora Queensland Australia

    Commodity: Copper
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 75000 tonnes

    W. Wall and Sons are looking for smaller operators with the capital to extract Copper and Silver from the site on either outright sale or shared basis. Drilling carried out has proven up 75,000tonnes Copper and 3mil ounces Silver

  • Mt Vetters

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 0

    The Mt Vetters Project (exploration licence E24/210) and covers an area of approximately 98 km2 and is located 50km north of Kalgoorlie, Western Australia and lies adjacent to multiple nickel and gold mines and in an area prospective for granite hosted gold & ultramafic related nickel. Mt Vetters is bounded Read more [...]

  • Music Well

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 0

    The Music Well Project is made up of two exploration licences (E37/1362 and E37/1363) and covers an area of approximately 290 km2 approximately 55km north of Leonora, Western Australia. Music Well is located in a part of the Yilgarn where intrusion-hosted gold mineralisation in granites has been demonstrated, with three Read more [...]

  • Arcoona

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 0

    The Arcoona Project (exploration licence E31/1203) is located approximately 4 km west of the Northern Star’s 1.2 Moz Carosue Dam gold mine and 115km from Kalgoorlie. The tenement is mainly flat lying and mostly covered by alluvium or colluvium with little outcrop and no known historic mine workings. Minimal exploration Read more [...]

  • Arcoona

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 0

    The Arcoona Project (exploration licence E31/1203) is located approximately 4 km west of the Northern Star’s 1.2 Moz Carosue Dam gold mine and 115km from Kalgoorlie. The tenement is mainly flat lying and mostly covered by alluvium or colluvium with little outcrop and no known historic mine workings. Minimal exploration Read more [...]

  • Palmer River Gold Project for JV

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): -

    Hardrock Mineral Exploration Pty Ltd is a privately owned exploration company operating in North Queensland, with 300 Square Kilometres of approved tenements and another 200 Square Kilometres under application and proven high grade results throughout the tenements, with an alluvial operations operating within several of our tenement boundaries. Proven stream Read more [...]

  • The Great Caesar Prospect [SOLD]

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): N/A

    Comprises 3 granted mining leases Great Fanning No3 ML1439 Caesar No1 ML1353 Caesar No2 ML1352 Total area of 128 hectares. Mainly gold and traces of other minerals. Located 40km Southwest of Townsville in the Charters Towers mining district, and about 3km West of the Far Fanning Gold Mine. Expressions of Read more [...]

  • Harts Range Garnet Project

    Commodity: Gold
    Development Stage: Production
    Total Resource Estimate (M+I+I): 23Mt at 5.1% garnet for 1.2Mt of garnet

    Australian Abrasive Minerals Pty Ltd (Administrators Appointed) (AAM) has appointed PCF Capital Group (PCF) to seek indicative offers for the acquisition, or such other arrangement to the satisfaction of AAM, of the Harts Range Garnet Project (Harts Range or the Project). Located in Australia’s Northern Territory, the Project comprises the Read more [...]

  • Quality Coal Project in Bowen Basin, Queensland

    Commodity: Gold
    Development Stage: Production
    Total Resource Estimate (M+I+I): coal 435Mt

    Aquila Resources Pty Ltd (Aquila or the Company) is seeking indicative offers for the 100% acquisition of the Talwood Coal Project (the Project). The Talwood Coal Project is located in the Northern Bowen Basin, Central Queensland, ~200km west of Mackay and ~40km north of Moranbah. The Bowen Basin is responsible Read more [...]

  • Mamba Nickel-Copper Projec

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): Nickel Copper

    The Vendor is seeking expressions of interest (EOI) for the potential joint venture or acquisition (in whole or in part) of its wholly owned Mamba Nickel-Copper Project (Mamba or the Project) in the Fraser Range of Western Australia. The Project provides an opportunity to obtain access to a prospective Ni-Cu Read more [...]

  • Crowl Creek CU-AU-Pb-Zn Project

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): CU, Au, Pb, ZN

    Contact: Dominique Stewart Company Name: Kidman Resources Telephone Number: +61 3 9671 3801 The Crowl Creek Project is located approximately 25km NW of Condobolin, New South Wales, comprising of 5 granted exploration leases. The project lies in the southern extent of the Cobar basin which hosts deposits such as the Read more [...]

  • Dalwallinu Gold Project

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): • 7m @ 21.8 g/t Au from 20m (including 2m @ 61.5 g/t Au from 24m) • 9m @ 6.3 g/t Au from 19m (including 2m @ 18.2 g/t Au from 23m) • 6m @ 4.9 g/t Au from 12m • 6m @ 3.2 g/t Au from 13m

    The Dalwallinu Gold Project (the ‘Project’) hosts a significant regional ground position over the Dalwallinu Greenstone Belt along the major Yerlering Fault Corridor. The Project includes over 20km strike length of prospective shear zone ground with historical geological, geochemical, structural and drill ready targets such as the Widgie Hill target Read more [...]

  • Saints Nickel Project

    Commodity: Nickel
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 1.05Mt @ 2.0% Ni for 21Kt Ni

    The Saints Project hosts the Saint Patricks, Saint Andrews and Western Contact deposits. An Inferred Resource was estimated in May 2017 (JORC 2012) for the Saints deposit of 1.05Mt @ 2.0% Ni for 21Kt contained nickel. PROJECT HISTORY: An Inferred Resource of 135,600 t @ 3.7% Ni was calculated in Read more [...]

  • Leinster Nickel Project

    Commodity: Nickel
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 0.6Mt @ 1.4% Ni and 0.3% Cu

    E37/909, M36/475, Area 122km2, Minotaur Exploration Ltd 100% The Leinster Nickel Project is located ~ 300km north of Kalgoorlie (Figure 1) in granites and greenstones of the Achaean Kalgoorlie Terrane. The tenements host known deposits of nickel sulphides and gold mineralisation. Inferred Resource (JORC 2004) for the Horn deposit 0.6Mt Read more [...]

  • Barnes Hill Project (Nickel-Cobalt)

    Commodity: Nickel
    Development Stage: Development
    Total Resource Estimate (M+I+I): 6.6Mt @ 0.8% Ni, 0.05% Co for 54Kt Ni, 3kt Co (at 0.5% Ni cutoff)

    The Barnes Hill Nickel-Cobalt Project is located ~4km west of Beaconsfield in northern Tasmania. The project boasts a open-pittable JORC resource of 6.6Mt @ 0.8% Ni, 0.05% Co for 54kt Ni, 3kt Co at a 0.5% Ni cut-off (Snowden 2010). Further work has confirmed potential existence of a discrete zone Read more [...]

  • NO LONGER AVAILABLE

    Commodity: Gold
    Development Stage: Production
    Total Resource Estimate (M+I+I): A further 6,000Ha to mine.
    Price: $1,500

    LARGE GOLD MINING OPERATION, – don’t procrastinate this IS a goldmine! We have state of the art plant & machinery and personnel ready to start. Currently operational.

  • GOLD LEASES FOR SALE

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): ZERO
    Price: $9,000

    Total of three leases. CALL WEN on 0456626516 for full DETAILS 2 LEASES IN MOUNT MAGNET , ABOUT 8KM TO TOWN CENTER , ONE IS 800 ACRES $30000 AND 51 ACRES $9000 ANOTHER LEASE IS IN KURNALPI ( 80KM SOUTH-EAST KALGOORLIE) IT IS JUST APPROVED POW , IT IS ABOUT Read more [...]

  • Gold Prospecting Lease Lennonville 2 claims

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): ZERO
    Price: $10,500

    Prospecting leases located west of the old town site Lennonville, neighboring claims P58/1744 and P58/1745 cover 200ha of quartz and ironstone fields (salt and pepper), creeks, ridges, open rich red earth, very clean no modern rubbish all over excellent geology. Targets have been recovered using minelab GPZ7000, loaming samples showing Read more [...]

  • CHESTERFIELD GOLD PROJECT – WESTERN AUSTRALIA GOLD MINING LEASE

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): ZERO
    Price: $17,000

    – Prospecting Licence covering 125 hectares (P51/2950). – Located in the eastern goldfields of Western Australia, 50km west of Meekatharra with access via the Carnarvon-Meekatharra Road. – The Chesterfield Gold Project area covers a portion of the Mingah Range greenstone belt. It lies on the western limb of a major Read more [...]

  • Gold Mining Lease

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 52.9 M/T of Ni @0.66% and Co at 0.042%
    Price: $18,000

    Granted Gold lease for sale. The “Missing Mine” is located just south of Menzies , Western Australia. Situated between Heron Resources ,( “Highway” Nickel and Cobalt deposit, with a Indicated resource of 52.9 M/T of Ni @0.66% and Co at 0.042%. ) and Rembrandts, Monet and Moriaty gold prospects to Read more [...]

  • Kunanulling Exploration

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 0
    Price: $20,000

    E16/533 for sale- granted exploration lease size-1BL=(300ha), this lease is in amongst operating mine sites, this lease is live with 5 years life and first option to extend for a further 5 years, for a programme of works all is needed is to negotiate as normal with the native title Read more [...]

  • HILLVIEW GOLD PROJECT – WESTERN AUSTRALIA GOLD MINING LEASE

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): ZERO
    Price: $22,000

    – Prospecting Licence covering 182 hectares (P51/2929). – Located in the eastern goldfields of Western Australia, 35km southeast of Meekatharra with access via the Meekatharra-Sandstone Road. – The Hillview Gold Project area covers a southern portion of the Meekatharra-Wydgee greenstone belt. Local geology comprises tightly folded greenschist rocks including mafic, Read more [...]

  • 4 x Kookynie Prospecting Leases

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): n/a
    Price: $25,000

    SUMMARY: Four gold leases for sale in Koolkynie area. $7500 ono each lease or $25,000 for the four leases. OTHER INFO: Early stage Prospecting Licenses (P40/1400, P40/1401, P40/1402, P40/1403), in prolific archean-greenstone hosted gold belt of Western Australia. CONTACT: Call Kim on 0417919476 (+61-417-919-476 outside Australia)

  • Gold prospecting lease Kookynie

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): ZERO
    Price: $35,000

    Aluvial gold lease + Bobcat 753 + Dry Blower . Proven area about 8 klm out of town. We only check the phone in the afternoon so please call or send a message. About 100 acres(42.5 ha) .Will separate if wanted. Call on 0410062531

  • Goongarie Main Mining Centre

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): ?
    Price: $96,000

    Last of the Eastern Goldfields of Western Australia central historic mining camps for sale to be mined. The rich Goongarie Mining Camp. On offer is 4 of the central mining tenements all on the 5 klm strike in Goongarie. The Caledonian and Boddington lease alone in past historic records has Read more [...]

  • Lease for sale meekatharra

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): Unknown
    Price: $120,000

    Prospecting lease transferable to mining huge potential copper malachite mountain breaking into quartz reef then breaking into ironstone deposits with alimony and zinc indications on block with gold specimens weighing over 200oz and pipe gold found on centre of lease with over 100 years of rich history dating back to Read more [...]

  • Gold Mining Lease (ML70406)

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): n/a
    Price: $130,000

    SUMMARY: ML70406 is a Level 2 Non Code Compliant lease and is currently part of the Swan Project on Miclere, it has an area of 45.24hectares. No Native Title-EXCLUSIVE LAND. ML70406 is being sold as a bare lease (no machinery, Infrastucture) TENURE: Lease commenced 01.JUL.2013. Expiry 31.MAY.2033. PRICE: Price to Read more [...]

  • TWO ADJOINING GOLD LEASES FOR SALE AT CLERMONT QLD

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): ZERO
    Price: $135,000

    Selling Two Mining Leases. ML 70509 & ML 70510. Situated at Miclere, 35km North of Clermont QLD. On Charters Towers Road. A Great Opportunity to Detect or Mine. This Gold Bearing Land is Undulating and Has Many Gullies. Large Deposits of Quartz and Ironstone Everywhere. Both Leases Were Granted 7th Read more [...]

  • VICTORY GOLD MINE

    Commodity: Gold
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): 0
    Price: $150,000

    EXECUTIVE SUMMARY The Victory Gold mine project is a drill-ready resource target acquisition opportunity on a granted Mining Lease within easy trucking distance of several existing gold processing plants in a well-established gold belt in WA’s Eastern Goldfields (Fig. 1). Surface sampling and shallow drilling have identified shallow high-grade resource Read more [...]

  •  

    Exploration license

    Commodity: Copper
    Development Stage: Exploration
    Total Resource Estimate (M+I+I): Zero
    Price: $250,000

    Broken hill type deposit,exploration license,three unit ,close to big production guys and area is the direct geographical extent of highly density producing companies in broken hill. six years new licence .very close to broken hill ten minutes driving, contain main reserve of water in the city, government study indicate high Read more [...]

  • ML100198 FineGold Creek Nth Qld

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): Plus 50000m3
    Price: $250,000

    This exciting opportunity to mine gold in a just granted Mining Lease that has never been mined before A short access road is needed to gain access to the lease Due to a heart attack I cannot go on with this project and would like to give someone else the Read more [...]

  • Meekatharra Gold Mine

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): 30,195t @ 4.45g/t for 4320oz Au (non-JORC)
    Price: $250,000

    The gold mine is located near Meekatharra in the Murchison Goldfield of Western Australia and has lots of mining infrastructure in the region. The historic underground mine is recorded to have produced 27,500t@ 22.8g/t gold during 1903 which is highly significant. Public records show that during the 1980’s a major Read more [...]

  • GOLD MINING OPPORTUNITY [SOLD]

    Commodity: Gold
    Development Stage: Production
    Total Resource Estimate (M+I+I): ZERO
    Price: $250,000

    Mining Lease with Mill FOR SALE $250,000.00 Negotiable – Mt Magnet Included is a Crushing, Milling and Gravity Circuit This Lease has historical diggings. Expression of Interest by email: Attention Rob hrgoldfinger@telstra.com

  • East Fine Gold CK Project

    Commodity: Gold
    Development Stage: Production
    Total Resource Estimate (M+I+I): 42319 grams = 1358ozAu
    Price: $600,000

    Alluvial Gold Mine Located in the Southern side of the Historical area of the Palmer Gold fields. This is a rare opportunity that will ensure the company has access to greater amounts of area 500sq/klms under EPM by Hardrock Mineral Exploration once Shares are purchased. Our company was formed in Read more [...]

  • PARTNER WANTED – Gold Mining Operation [SOLD]

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): 4,152oz
    Price: $600,000

    We need a short term investment of $600,000 to help establish a profitable and proven, gold mining operation. You become an equal 1/3 partner in the project, with a seat on the Board, your investment is repaid in full from profits, within 4 -6 months of mining commencement and continue Read more [...]

  • Northern Territory, Australia

    Commodity: Other
    Development Stage: Production
    Total Resource Estimate (M+I+I): 100,000t @ 0.75%sn worth about $24m
    Price: $1,300,000

    Initial Tin Tailings, worth about $24m sufficient to buy and fund the whole large lucrative project. Full details available to interested parties. 16% Company shares, Directorship, & refund of $1.3m contribution within 6months. This is the opportunity to become part of a Billion Dollar project! This could be operational with Read more [...]

  • 35,000Ha of gold bearing resources

    Commodity: Gold
    Development Stage: Production
    Total Resource Estimate (M+I+I): 5mt @ 0.3-5g/t Plus immense gold area to test
    Price: $6,000,000

    Looking for a high net worth gold project? Gold is on the rise again, protect your wealth Our company is based on trust and good ethics, we believe in transparency and fairness in all our dealings and this applies to any proposed Joint Venture partner. We offer a Joint Venture Read more [...]

  • Tin-Copper-Gold Project

    Commodity: Other
    Development Stage: Development
    Total Resource Estimate (M+I+I): 25m/t
    Price: $8,000,000

    Tin-Copper-Gold Project This Project is located in the Northern Territory of Australia. It has published resources of tin-copper & gold deposits • 737,000 tonnes at 1.38% Sn underground • 400,000 tonnes open cut at 0.4% Sn • 971,000 tonnes grading 1.5% Cu. • Work has advanced to confirm a minimum Read more [...]

  • NT Gold Mine – Over $400million in ground

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): 258,812oz gold
    Price: $8,000,000

    This is an approved mining lease handy to Darwin * Estimated to have 258,812oz of alluvial gold. * Over $400 million in ground. * Only about 1/3rd of the lease has been drilled and tested, the rest is still to be tested. * It has plenty of water available, * Read more [...]

  •  

    Peko Tailings Retreatment Project [SOLD]

    Commodity: Gold
    Development Stage: Development
    Total Resource Estimate (M+I+I): 3.8Mt tailings resource, with gold at 1.14g/t, 0.25% copper, 0.11% cobalt and 80% high grade magnetite. JORC report pending
    Price: $20,000,000

    Peko Bull Pty Ltd (PekoBull) is currently seeking expressions of interest for investment in the Peko Tailings Retreatment Project (the Project). It is proposed to build a processing facility, and then establish a 5-7 year tailings retreatment operation. The recoverable value of the metal content, in the tailings is over Read more [...]