FAMOUS KEITHLY CREEK

Project Category: ProductionProject Tags: 1 to 4 ounces per 100 yards.

Profile
Profile
More Info
Map
Related Listing
  • Turn key Placer mine,2200 acres to the head of Famous Keithly Creek both sides of creek. 45 cells. Active water license. Existing permit. Assessment til 2035. Easy access roads are established to claim. 1 to 4 oz per 100 yards. Assay 89.5% gold, 9.5% silver. Six inches over burden.Timber sale and permit approved by Ministries just need WLIB approval. One wash plant and two excavators, fuel tanks, 8 inch newer pump and c can included. Camp cleared, ponds and silt ponds built and functioning, plant set up on platform or move plant and fill mined areas with tailings. Mining season May 25th to November 15th most years sometimes longer.

  • Total Resource Estimate (M+I+I): 1 to 4 oz per 100 yards
  • No Records Found

    Sorry, no records were found. Please adjust your search criteria and try again.

    Google Map Not Loaded

    Sorry, unable to load Google Maps API.